Treatments

Needed by whom and when

Basic statements about who needs the functionality and by when.

UCJEPS: Some functions needed by the time they move to CollectionSpace as their production system

Overview

UCJEPS applies treatments to some specimen sheets (e.g., "frozen") or needs to indicate that a specimen has been treated (e.g., "poisoned").  Treatments do have some attributes (e.g., materials, duration, person applying treatment, notes).  Specimens can have multiple treatments.  This sounds a fair bit like conservation, and it also sounds like propagation, as needed by the UC Botanical Garden. Note that botanical propagation modeled in the SAGE collection management system (used currently by the UC Botanical Garden) includes a more complex model -- a specimen can have multiple propagation transactions each of which can have multiple treatments applied.

Question: Is specimen treatment more like conservation or propagation?

Question: What is the schema for a treatment. 

Note: Be sure to look at information requirements for Botanical Garden plant propagation.

Note: A treatment batch processing user story is documented on the batch processing page.  (E.g., all specimens returning from loans out are frozen.)

Unknown macro: {multi-excerpt}

Treatments UCB user stories for prioritization

Specimen treatment: User can identify a treatment (e.g., frozen, poisoned) that has been applied and attributes about the treatment.  Specimens can have multiple treatments over time.

Specimen treatment: One specimen treatment can involve repeating elements, probably as a repeatable group (e.g., materials, duration).

Prioritization of user stories

As definitions and priorities are clarified, the user stories above should be moved into relative order below.

Must have for 1.x-MUSEUM (when they go live in system)

Placeholder for required functionality.  As a general rule, functionality that you need and use now should go here or where you have existing data.  However, this is up to the museum.  We will have to balance requirements against resources and timelines.

Placeholder

MUSEUM could wait six to twelve months

What could wait?  These will be re-prioritized at a later date.

Placeholder

MUSEUM would like to have this eventually

These are nice to have but not a near term requirement.

Placeholder